Showing posts with label canals. Show all posts
Showing posts with label canals. Show all posts

Tuesday, 5 October 2010

Day 20 : Flamstead to Chatham, 68 miles, wet start to dry and overcast

Well I may have got a good night's rest but the weather was no better in the morning. Despite my best efforts, substantial 'as much as you can eat breakfast at 7am etc, I didn't get away until just before 8am. This was probably a good time to go with hindsight as I suspect that HGVs avoid the rush hour journey along the A5 into St Albans.
Notwithstanding that the journey all the way to Barnet on A5 via St Albans (nice but didn't look around much), Colney, M25 junctions 22 and 23 via Blackhorse Lane, South Mimms certainly got me close to certain good and poor aspects of highways design.
London Cycling Guides - these are really excellent and are available free on line from tfl.gov.uk
However, once in Barnet the excellent and free London Cycling Guide map series (I had carried the four relevant ones with me all the way) came into their own. They are absolutely superb, although I could have protected them better from the rain, and I enjoyed the whole way back from there on in. Routes are colour coded to one of six types and I easily followed yellow routes (quieter roads recommended for cyclist although not necessarily signed) all the way to Tottenham Hale. This is the current link to order cycle guides on line.
The point at which I reached Route 1 (this is the route that goes through Kirkwall, hugs the east coast and passes our house enroute to Sandwich/Dover). The path follows towpath to west of the River Lee Navigation from Stonebridge Locks, however as there was only one arrow on the post it was not at all clear!
Route 1 takes a little diversion across this footbridge and then around Hackney Marshes. It is completely unnecessary, today it required a splash through 300mm of water and a trek across muddy playing fields just to get to the same canal towpath I was on already! I wasn't very impressed with myself for not noticing that on the TfL cycle guides.
First sight of Isle of Dogs
I passed by the Olympic site and into Mile End.
After turning west away from the Hackney Cut of the River Lee Navigation and along side the Hertford Union Canal, the route took me through Victoria Park and then south through Mile End Park, between Mile End and Limehouse. I have to admit not being at aware of the existance of the very pleasant series of parks. On leaving the park, I almost made a fateful mistake on turning right on CS3, Cycle Superhighway 3, which although it was clearly signposted to Tower Gateway did look very inviting!


Millwall Inner Dock from Pepper Street towards One Canada Square
Not a great photo but the route 1 takes lifts up and down from the pedestrian tunnel (designed by Sir Alexander Binnie). Built from 1899 to 1902 it replaced an sometimes unreliable ferry service. The southern tunnel entrance in Cutty Sark Square. The tunnels and their staircases are currently be refurbished as it the Cutty Sark (out of shot but behind me!). A quick pit-stop to buy lunch of sandwich, fruit, Eccles cakes and orange juice from M&S and I was straight back on the road. I'd divided today into 5 sections of 20km each and Greenwich was the end of section three. I knew I had to keep moving!
Several hundred extras being allowed to cross Romney Road for a the next of the Pirates of Caribbean films, On  Stranger Tides (due for release in 2011) part of which is being shot near Greenwich Park and the National Maritime Museum (thanks for the help on this one - see comments and this link). The characters looks very believable to me!
I took route 18 to Woolwich which was a safe and easy ride at this time of day
Looking upstream back towards Canary Wharf and O2 Dome with Thames Barrier in the foreground. Route 1 joins the path alongside the River Thames for the next 10 miles (apart from a short break at Erith) when it turns inland to follow the River Darent and Crayford Creeks into Dartford.
According to its Wikipedia entry the Thames Barrier started construction in 1974 and although largely finished in 1982 was not officially opened until 1984. The concept of the rotating gates was devised by Charles Draper. The barrier was designed by Rendel, Palmer and Tritton for the Greater London Council and tested at HR Wallingford Ltd. The site at Woolwich was chosen because of the relative straightness of the banks, and because the underlying river chalk was strong enough to support the barrier. It is the world's second largest movable flood barrier (after the Oosterscheldekering in the Netherlands)
Some of the Grade I and II listed buildings in the Royal Arsenal Development. Over 3,000 people now live on the coverted Royal Ordnance Factory site (closed in 1967). Plans have now been submitted for a new masterplan encompassing further land along the river. The new plans incorporate a further 1,200 new homes, along with 270,000 sq ft (25,000 m2) of commercial, retail, leisure space and a 120-bedroom hotel. Also included in the plans is the new Woolwich Crossrail station, which has been part-funded by Berkeley Homes.
The cycle route continues past the Riverside Resource Recovery (RRR), energy from waste facility. According to the company's website, the Riverside Energy from Waste facility at Belvedere in the London Borough of Bexley, is Cory Environmental's single most significant development project. With an average annual capacity of 585,000 tonnes, it will be an important strategic river-served waste management facility for London, helping the capital to manage its own waste, keeping over 100,000 HGVs off the capital's congested roads each year and making a real contribution to London's ability to meet its landfill diversion targets. Looks a little like an incinerator to me.
Dartford Salt Marshes with the Dartford River Crossing (QEII bridge, 1991) just visible in the gloom!
Once in Dartford the route is easy and follows a dedicated path in the corridor of the A2, but away from it, after Bluewater.
Further along the same stretch the route utilises the old A2 surface for several mile. The path meanders pleasantly with new landscaping on either side.
Familiar local journeys suddenly didn't seem that far nor the gradients very steep at all as I rapidly found myself pedalling back over the bridge I'd started on a few weeks ago.

Looking the other way from the way I left 20 days ago, across the bascule bridge taking me across onto St Mary's Island, Peel Port's Chatham Dockyard can be seen beyond the first basin.

Sunday, 3 October 2010

Day 18 : Shepshed to Northampton, 56 miles, sun with cloudy intervals

Shepsted is a small town a few miles north-west of Loughorough and I knew it was going to be a good day when I opened the curtains to see most of the rain clouds had vanished. I took route 6 all the way to the north of Northampton via Loughborough, Leicester and Market Harborough.
Bike parked in sunshine below the bedroom - each door is an entrance to 3-4 self catering units
Loughborough, as I had expected from its sporting reputation, was well stocked with cycling provision. The best aspect being the attention to detail in the routing of the paths especially at junctions; there are certainly other places that I'd passed through that could learn a lot here.
There were also neat design features to make sure cyclists can join traffic flow without being run down.
I'm not sure that I have ever been anywhere in Leicester other than stopping in a train at the main station. I realise my transit through the city was fairly superficial but I am getting the impression that from the cycle route of old canal tow paths and railway lines I do see a side of these cities that it is not seen by people in their cars or simply shopping.
Leicester City Centre Park
Leicester City Centre Weir on the River Soar
Route 6 leaves Leicester to the west along the old Great Central Railway line, there is an alternative route 63 that is three miles shorter from Leicester to Market Harborough which goes due south. However, it has 11 miles less traffic free routing and the climbs are steeper or so I am led to believe!
The ride I took was great and there was still some hard climbing from Leicester to Saddington, five miles north of Market Harborough. 
looking towards one of the steepest climbs since the Yorkshire Moors.
The section along the Grand Union Canal just before Market Harborough was very tranquil; I particularly liked the various bridges that peppered the route, each one with a name which I can only presume related to the land owners for whom the bridge was constructed to provide access.
One for Jane - just to make sure she knows I hadn't forgotten Frankie!
horses in Leicestershire
Market Harborough market place where I had a late lunch of ham and cheese pancake followed by a lemon and sugar one. They were huge! 
From Market Harborough to Northampton route 6 is traffic-free for 16 of the 18 miles and follows what is known as the Brampton Valley Way. This consists mostly of railway lines, including over 800m of unlit section in tunnels but also some canal tow path closer to Northampton.
Kelmarsh Tunnel (480 meters). I got out both front lights this time and it was much easier going!
13 miles to go and stopping to call Jane from the side of the route whilst it was still light!

Saturday, 2 October 2010

Day 17 : Hope Valley to Shepshed, 50 miles, heavy driving rain all day

I set off for Shepshed (4 miles NW Loughborough) after 12:30 in the hope that the rain might ease off a little and there is little to indicate in this picture quite how wet and windy it was. However, the rain did manage to get the Ryder Cup in South Wales delayed for some hours so and I'm sure that was not just because, as a Scottish newspaper put it, the event was brought by money to a river valley in South Wales!
Nearly out of the gate! 
,,,,and I'm off (9 seconds later) via Calver, Baslow, Chatsworth House, Beeley, Rowsley, Matlock, Cromford, Wirkswater and Duffield to Derby
... another 6 seconds later on the road and I'm still trying to remember all the place names from Derby to Loughborough as I was determined not to open up any of my panniers and get everything wet.
Whilst I have no regrets taking the route I did in the circumstances, there can be no doubt that  the A6 on a Friday in heavy rain, with showers of spray and half the road flowing like a river 10% of the time was not much fun! I was particularly pleased with myself that I cycled the whole way up the hill out of Cromford, without stopping once, on the B5023 all the way to Wirksworth. This was partly to keep me warm as I was by now soaking all the way through - the water from the road having penetrated everything from underneath!
I took the opportunity, on the way down just after Wirksworth, to take off all my wet clothes and put new dry ones on. The icing on the cake was a £8 sheet of polythene, 'novadry' poncho that Decathlon sells for cyclists in these circumstances. It really looks awful but I had carried it  and thought that now was definitely the time to get it out. Apparently it is breathable but I think only to a point. Anyway it did the trick and I got all the way to my destination with only my feet feeling like they were in a bucket of cold water.
The upshot of all this is that I did not stop to take any photos, or to look at the soggy frontage of Chatsworth, or the historic mills and sites of the Peak District.
From Derby going south, I joined Route 6 and this was a real joy - 18 plus miles of canal rides seamlessly flowing into wide railway paths taking me as far as Worthington. 


The first section of route 6 out of Derby is called the Canal Path but some of the canal into Derby has now gone. At this point, just beyond the bridge, the end of a narrowboat can be seen indicating the adjacent Trent and Mersey Canal.
The Trent and Mersey Canal by Swarkestone Lock. The canal goes from the Bridgewater Canal, near Northwich and Sandback in the NW, across to Shardlow, where it links to the River Trent. The later point is interesting from Jane's family history as relatives of hers are Shardlows that come from this area. This bridge at Swarkestone dates from 1810 but original ones date back to the 13th century. The original river crossing marks the furthest point south reached by the Jacobite army of the Scottish Young Pretender Prince Charles Edward Stuart in 1745. There is quite a flow of water coming through the culvert just below the bridge on the far canal bank.
The Canal path was wet but was a great ride - I expect in summer it can get very busy and as it is very narrow in places it might be difficult to travel at my 'cruising speed' of 15mph.
I took this photo to show the care taken in marking out the route and ensuring it is suitable for horses, walkers and cyclists. This disusedrailway line was particularly wide, the bridges in particular were very noticeably wider, and it could have had more than two lines.
Well signed, smooth and rolling country roads took me on towards Shepshed. I stayed at The Grange Courtyard which somewhat surprisingly has no front entrance and hides itself a little too discreetly behind the old red brick of the stable yard. Unfortunately, Shepshed appeared to have only one really good eating place within walking distance - a very popular, lively and fully booked Italian establishment. I dodged the numerous well lubricated gangs in the poorly lit streets to take home a huge Chinese take-away! Perhaps I now understand why the Grange Courtyard may prefer to hide itself away from sight. 
On a day that I thought I would have no photos I do appear to have taken some, even if the last ones shows signs that my camera was already a little wet!


Thursday, 30 September 2010

Day 15 : York YHA to High Melton, 51 miles on a very wet day!

There is a risk that I could feel a little sorry for myself but I do seem to have been a little unlucky with the weather of late. However, that is not to say that I haven;t been lucky in other ways. Today's ride, although very wet (did I mention that yet!), was fantastic and I really enjoyed it. 
That was partly because the issue with the back axle has now entirely gone away. I have to thank the guys from Cyclestreet bike shop (Dawes dealer) in York and I now have a new wheel on the back, the previous one had had a good run, the ride is as good as new. They dropped everything, and despite a hearing of a fatality of someone they knew overnight, they both were extremely helpful and did what was necessary to get me moving again. More of the country needs businesses like this. 
The next door deli is also fantastic and I had a couple of very exciting sandwiches later in the day that I bought there. I also learnt that the faster time for Land's End to John O'Groats is less than 2 days and that the guy on the left in the photo below (done the trip twice) completed one of his runs in 7 days including a 180 mile day!! I still think the Dean of Rochester at 12 days was fairly good going. You won't be reading about me complaining about any long days for me in future.   
Jon Dean (right) MD of Cycle Street at 1 Heworth Village, York The business has been going for six months and  provided me with great service  (http://www.cycle-street.co.uk/)
York is clearly one of those cities that takes its cycling very seriously. The road markings and cycle routes are brilliant all over the place - although I was told that bicycle theft is on the increase. A really great place that I must get Jane to take me back to.
Route 62 to Selby follows an old railway line and has been a traffic-free route for the last 25 years.
The path is fantastic and fast for at least 50% of the way to Selby
Selby Abbey, founded in 1069, 
The Abbey was apparently founded when Benedict saw three swans on a lake in Selby, and he saw it as a sign of the Father, Son, and Holy Ghost. This is why the official crest of Selby Abbey is three swans.
I was familiar with Selby as an important coal mining town but was no so familiar with the fact that its position on the Selby Canal led to it having a substantial ship building industry. According to the Wikipedia for Selby the current Greenpeace craft bearing the name Rainbow Warrior was built in Selby in 1957  
One of a number of locks along the route - not many boats using the canal today though!
Riding along side the Selby Canal makes short work of the distance from the cooling towers of Drax to those of power stations closer to Doncaster.
There were plenty of people out working in the rain today from the people clearing the vital land drainage ditches near Selby to the manually operated level crossings closer to Doncaster. In fact I am not sure I have ever seen so many level crossings in a stretch of 2-3 miles before - from Ouston Wood to Bentley; some automated, some operated manually by others and one I had to open and close all the gates myself.
I stayed at Doncaster College's Conference Centre - the Stables at High Melton - that has rooms for hire when not used for other purposes. Jane found it for me and at £30 including breakfast is great value although I couldn't eat last night as there is nothing within walking distance I am looking forward to a big breakfast in the morning.